Contact RISMED View Frequently Asked Questions View Site Map and Search Print Page   


Oncology Systems - Low Energy Bunker Layout

 

  Varian Low Energy

Preinstallation data

Click here to enlarge bunker...  Click here to enlarge dimensions...

 

Load:  Beam On - 12KVA 

 

Voltage: (one of the following must be specified on order)

1. 208V/120 VAC, 70A, 60 Hz, 3Ø, 4 wire

2. 380V/220 VAC, 40A, 50 Hz, 3Ø, 5 wire

 

Branch circuit protection: A seperate grounding connector is required.

 

Variation: ±5% (maximum allowable deviation from nominal value selected) Installation per local code requirements is user's responsability.

 

Cooling Water Requirements: With incoming water temperature at 30°C (86°F), a flow of 11.4 liter/min (3 GPM) is required with a minimum pressure differential of 2 kg/cm²(30 PSI) at the machine base.  The maximum overall pressure, shall not exceed 7 kg/cm² (100 PSIG).  Incoming water temperature shall be between 10°C and 30°C (50°F-85°F).  Power dissipation into cooling water is approximately 1 kW in ready mode and 7 kW at full power operation.

 

Ventilation Requirements:  Room ventilation sufficient for removal of an air heat load of 5kW (17kBtu/hr) is required

 

Expansion in Mexico [more...]

Venezuelan Office Coverage Expansion [more...]

RISMED in Peru [more...]


Visit Varian
Visit Toshiba
Visit Oldelft


© 2003, RISMED,Inc. All rights reserved. All brand and product names

 are the trademarks or registered trademarks of their respected companies 

and RISMED makes no representation of these companies. Terms of Use  

Send Questions or comments concerning the website to info@rismed.com